Wednesday, January 8, 2014

6th Full Day of Bathroom Renovations

Since the last bathroom update we've visited Buffalo and Louisville, submitted drafts of conference papers, and dealt with assorted other work and research stuff, but didn't really touch the bathroom.  Also when we got back from Louisville they closed all the roads (ALL the roads) to non-emergency traffic due to snow and extreme cold, which gives you a reason not to go to Home Depot for supplies for your next step.  There had been some minor touching up (I closed off the hole in the decking from moving the register box for instance) but the biggest difference was that all the wet nastiness has dried out completely, as far as we can tell.  All the wood that is still in looks good.

This is from before scraping the wood clean and drying it out - from before we left for Buffalo.

This is the after bleaching, scraping and drying - looks a lot better.

As you can see from the picture above, we decided to remove the plaster from the ceiling.  We originally hoped to keep that but when touching up some of the edges to try to get a flatter surface to mount sheetrock to, it became clear that significant areas of the plaster were already detached.  It was either drop the plaster or face the likelihood of a lumpy ceiling - we dropped the plaster.  The lathes look more level and they're holding up the insulation so I hope to keep those.

 Also I got serious about electrical stuff and put routing holes through the studs that should make putting in all-new wiring a snap, complete with nail plates so nobody like me later electrocutes himself installing a mirror or something.  One concern is that it appears that this room and like, half that side of the house are on a single circuit that MUST be original - it is cloth-wrapped and mounted on ceramic insulators and it goes all over the place.  As a lot of the attic floor is already up and I dug through insulation to find all the connections  (OK there are still a few missing, but I found a lot of them). I think we're going to go ahead and replace that monstrous circuit with about three separate smaller circuits that make more sense (ie, one per room for three rooms).  I will probably leave the old circuit in place, run new wiring where it needs to be, and when the old wiring is no longer connected to anything I'll just disconnect it from the source without removing it.  I will need to pull another 2-3 strategically placed pieces of attic decking, but once that is done I don't think doing the cable routing will be that bad - most of the walls are open to the basement or crawlspace and I already have several clear shots to the attic open.  I am going to need a lot more wire though.

It is now clear that we will not complete the renovation before the end of the break, in part because on Friday we're going to visit friends in Cincinnati.  Still, I am pretty sure we are not going to have a day as dirty as today again - that was the last of the plaster.  One of these days we're going to stop tearing things out and start putting them in.

We also spent a couple hours looking at vanities, fixtures, and fittings.  We bought some things, ordered some things, and haven't decided on some things.  Most of these aren't holding us up but the plumbing items are...Ana blames me for making the plumbing 'her' project, thus assigning it her luck instead of my own notably superior luck.  Everything we wanted or needed was out of stock everywhere, with expected restocking in March.  We won't be waiting that long and have chosen different components.  Not thrilled to pay more for stuff we like less but it will all be fine in the end.




Sunday, January 5, 2014

Mammoth Cave National Park

Haven't been bathroom renovation updates for a while because we haven't been at home.  I am sure everyone is waiting on the edge of their seats for more about that.  We went to Buffalo for Christmas, which we will not be blogging, and then to Louisville and Mammoth Cave National Park to meet up with my (Lee's) sister for a couple of days to hang out.  We drove down in a snowstorm but didn't drive into a ditch, stayed at a decent hotel in downtown Louisville, and ate at a couple of pretty solid restaurants. Since we're no longer in Japan and documenting food and whatnot we're only blogging Mammoth Cave.  A complete set of pictures is available here.


Mammoth Cave National Park is about a ninety minute drive south of Louisville and it wasn't a big deal getting there and back, so we signed up for both a morning and afternoon tour to see different parts of the cave.  The morning tour focused on history and went through areas of the cave that were explored starting thousands of years ago.  Apparently, Native Americans explored about 12 miles of the cave with torches thousands of years ago, which I think would be pretty scary - if you're 12 miles from the entrance and your torch goes out I expect it would be very challenging to get back to the entrance.  Fortunately for us, the trails have since been paved and lit with electricity so it was a pretty easy saunter for most of this tour.

This is the 'original' entrance that has been open for thousands of years

Our little handheld 'adventure' camera did really really well with pictures in the dark; more came out than didn't.  Mammoth is a 'dry' cave (meaning water is not still dripping through most of it) so while it is the biggest in the world by a large margin, it is somewhat less decorative than a wet cave that would have more stalagmites and so forth.

The clear path, lighting, and handrails made the cave feel almost like a fake cave, and disguised how far in and down we were - we went about a mile laterally underground and about 350 feet below the surface with a bunch of twists and turns.  Most parts were very open but in some we had to duck or contort to get through openings - they preferred to make the path fit the cave and not the other way round.


In some places the roof had been marked by candle or lantern smoke from 19th century explorers.


Fat Man's Misery was narrower than some other areas and the walls have been smoothed and polished by the passage of millions of people (literally).

Smoke from 1855

Many passages were...Mammoth...in proportions.

The "new" entrance was blasted by dynamite in the 20's or 30's.

Wooden stairs handled this entrance until the 60's but then they were so rickety they needed to be replaced and this entrance was closed for a while while they figured out how to best replace them.  According to the rangers, they went through a number of contractors that said it couldn't be done before hiring a company that generally fabricated submarines and knew a thing or two about stairs in confined spaces.  They weren't allowed to change the cave so the stairs spiral downward in elaborate and unusual ways.

Sometimes the stairs crossed through more open areas (this one has a BIG drop underneath it).

At a few points in both tours the rangers would stop and give a talk on the history and geology of what we were seeing.  Sometimes there were benches for people to sit on at these points, especially if the rangers planned to talk for a while.  Ana has a new record for distance below ground she has knitted of about 350 feet.  She was only knitting when seated, to keep hands free for railings, etc, the rest of the time.

Some walls had lichens on them but I'm really not sure how they survive down there.

We did see one area with dripstone formations that was pretty neat.




All in all I would recommend Mammoth Cave's tours as a relatively easy outing with good education about caves and geology.  We may go back for more tours and maybe the really difficult spelunking tour when they only take fit adults of less than a certain size (too big and you'd get stuck in a passage) sometime before we leave the area.  We'd also be interested to see some of the other notable cave national parks.

See Mom?  We didn't die.